跳到正文
Ethereum Foundation·· 28 天前精选AI 评分63

以太坊基金会推迟 Hoodi 测试网 Glamsterdam 升级

Glamsterdam on Hoodi Postponed

AI 导读

以太坊基金会宣布,原定 2026 年 10 月 26 日 17:42:48 UTC(epoch 132,352)在 Hoodi 测试网激活的 Glamsterdam 升级推迟,新的激活日期尚未确定。

推荐理由

Hoodi 测试网升级推迟且没有替代时间,后续需跟踪 EIP-8037 与主网合约交互的调查结论,以及各客户端确认移除旧激活时间的版本。

正文 · 原文

The Glamsterdam upgrade on Hoodi, previously scheduled for October 26, 2026 at 17:42:48 UTC (epoch 132,352), has been postponed. A new activation date has not been set.

This update supersedes the schedule and activation instructions in the Hoodi testnet announcement.

What Has Changed?

Core developers decided on ACDE #248 to delay the previously scheduled Glamsterdam network upgrade on the Hoodi testnet to allow for further investigation of interactions of EIP-8037 with mainnet smart contracts.

The delay removes the scheduled Amsterdam execution layer activation and Gloas consensus layer activation. It also removes the gas-limit schedule that would have raised Hoodi's gas limit to 200M at the same epoch.

This rolls back the configuration for a future upgrade; it does not revert Hoodi's chain history. The October 26 activation is no longer scheduled, and there is no replacement activation epoch or timestamp in the updated configuration. The scheduling of the replacement upgrade will be announced at a later date.

Hoodi Node and Validator Operators

If you operate a Hoodi node or validator, check both your execution and consensus layer clients for instructions reflecting the postponed activation before October 26. Software or custom network configurations that still schedule Glamsterdam at the old activation time need to be updated to match the revised Hoodi configuration.

Do not treat the client release tables in the earlier announcement as confirmation that those versions incorporate this postponement. Follow your client team's release notes and instructions for the revised Hoodi schedule. Validator operators should also review any instructions for their validator client and builder infrastructure.

Client Releases

New client releases incorporating the postponed Hoodi activation will be listed below as they are confirmed. Update both your execution and consensus layer clients to releases whose notes explicitly confirm that the October 26 Glamsterdam activation on Hoodi has been removed.

Please check back with this post as relevant client releases will be linked as they are released.

Consensus Layer Hoodi Releases

When running a validator, both the Consensus Layer Beacon Node and Validator Client must be updated.

NameVersionLink
Grandinev3.0.0-rc.2Download
Lighthousev8.3.2Download
Lodestarv1.50.1Download
Nimbusv26.10.2Download
Prysmv7.3.1Download
Teku26.10.2Download

Execution Layer Hoodi Releases

NameVersionLink
Besu26.10.1Download
Ethrexv30.0.1Download
Erigonv3.8.1Download
go-ethereumv1.17.10Download
Nethermind2.2.1Download
Rethv2.8.1Download

Builder and validator tooling guidance will be added as it is confirmed for the postponed Hoodi activation. Operators using external block-building infrastructure should follow their tooling provider's instructions.

Application Developers and Mainnet Users

Do not plan Hoodi testing around an October 26 Glamsterdam activation. A revised Hoodi activation schedule will be announced separately.

This announcement concerns Hoodi. It does not set a Glamsterdam mainnet activation date, and no action is required from Ethereum mainnet users or ETH holders as a result of this update.

来源:Ethereum Foundation · blog.ethereum.org